Getting your backyard ready for marquee day: a checklist
Our experienced team and installers carry the frames, walls, chairs and tables in from the ute. A clear path and a marked spot make setup quicker and keep your yard and our gear in good shape. Here's the checklist we give every customer.
A few days before
- Mark the spot with pegs or paint, and allow about 1 m of extra space on each side for pegging.
- Tell us about anything underground where we'll be pegging: pipes, cables or sprinklers.
- Check overhead for low branches, eaves, gutters and wires. Our marquees peak at 3.9 m, with 2.1 m walk-under clearance at the edge.
- Tell us at booking about stairs, lifts, a carry of more than 20 m from where we park, hard surfaces that need weights, or a same-day or after-hours time.

On the day of setup
- Clear the driveway. Move all cars so we can back the ute up close.
- Clear the side access. Move bins, hoses, tools and rubbish so our trolleys can get through.
- Clear the install area. No furniture, clotheslines, bikes, toys or anything else where the marquee goes.
- Keep pets and kids inside while the frames are going up.
If we have to clear the site so we can set up, we can do that for an extra charge, which we'll quote you first. If you can't clear it, tell us well before the day.

During your hire
- Don't move, re-position, add to or alter the marquee, pegs or weights.
- If you take the walls down, fold them into the bag or tub we leave and keep them somewhere safe and dry.
- Keep metal objects, cars and bikes away from the walls and canopy. Footprints, tyre marks and rust marks don't come off.
- Watch the wind. Read our wet-weather guide for the gust rules.

Before pick-up
- Clear the driveway, side access and the area again, just like setup day.
- Wipe and stack the chairs, and wipe, fold and stack the tables under the marquee.
- Take any other furniture, decorations and rubbish out from under the marquee.
The full wording is in our small print.